Paving and street works take-off online

One row per street or area: length, width, surfacing, kerbs and channels. The tool computes the areas, the slab concrete, the base course, the sawn joints, the pavers and their sand bed, the kerbs, the channels and the excavation, then the bill of quantities in Excel.

1. Streets and areas
2. Thicknesses and options

Take-off

What the take-off contains

Upgrading neighbourhoods and paving narrow streets

In urban upgrading programmes, narrow streets are often paved with 12 to 15 cm of concrete on a crusher-run layer, with a central or side channel. Enter each street with its real width (it often varies from one stretch to the next: use several rows) and the number of kerbed sides.

The thicknesses and ratios (concrete per metre of kerb or channel) can be edited: use those of your specification to match the contract items.

Frequently asked questions

How do I calculate the concrete volume of a slab?

Area × thickness: a street 100 m long and 4 m wide at 15 cm needs 100 × 4 × 0.15 = 60 m³ of concrete, plus 3 to 5% wastage when ordering.

How far apart should the joints be sawn?

Generally every 4 to 5 m (about 25 to 30 times the slab thickness), and one longitudinal joint when the width exceeds 5 m. The spacing is adjustable.

How are kerbs counted?

Street length × number of kerbed sides. Dropped kerbs, corners and garage entrances are counted separately, as additional items in your bill of quantities.

What base course thickness?

Often 15 to 25 cm of compacted crusher-run under a street slab; more under a road used by lorries. Follow the design study or the specification.

Other quantity take-offs and calculations